Wednesday, 3 December 2008

New Offices To Let for Basingstoke



CENTRAL40 is a 3 storey office building designed to the highest standards. The office is principally clad with glazed curtain walling and has been designed specifically to optimise workplace flexibility, reduce energy consumption and minimise running costs.

The offices are provided over three levels, with the a feature double height reception. The building’s construction and the innovative air cooling system ensure that maximum energy and space planning efficiency can be achieved. Other features which create an excellent overall working environment include LG7 lighting, rain water harvesting, shower facilities on each level, solar heating water to common areas, and an intelligent building management system.

SPECIFICATION
CENTRAL
0 Double height reception area
0 1x17 person passenger lift
0 Down flow comfort cooled air conditioning system
0 Full access 300mm raised floors
0 LG7 Lighting to office areas to achieve 350 lux
0 1800mm planning grid
0 3.0 kN/m2 (3 + 1.0) floor loadings
0 Building management system
0 Access Control System
0 Male and Female WC, disabled and shower facilities on each floor
0 150 Car parking spaces - ratio 1:274

No comments: